Pre-lift planning checklist

Prompts for the pre-lift briefing: load, equipment, ground, load path, exclusion zone, signals and stop conditions.

Format
PDF (A4) · printable web page
For
Lift supervisors, appointed persons, slingers and operators
Version
v1.0 · reviewed 30 October 2026
SAFETY SUTRAS · FIELD RESOURCEv1.0

Pre-lift planning checklist

For routine lifts and pre-lift briefings. Complex lifts need a written lift plan prepared by a competent person.

Lift description
Date / time
Lifting equipment
Person directing the lift

Load and equipment

  • Load weight, centre of gravity and lifting points are known
  • Equipment capacity is adequate for this radius / configuration
  • Lifting equipment and accessories are inspected and within examination date
  • Pre-use checks are complete

Site and people

  • Ground conditions under outriggers / tracks have been assessed
  • Overhead lines, structures and other obstructions are identified
  • Load path is agreed and the exclusion zone is set. No one under the load
  • Signals, communication method and the STOP signal are agreed by everyone
  • Weather / wind limits for this lift are known

Specific hazards and controls for this lift

Confirmation

Stop the lift if
Briefing given by

General discussion aid, not a risk assessment, permit or procedure. Adapt to your site’s hazards, legal requirements and competent advice.